(1) Receive an update on the 2026 Street Paving and Sidewalk Repair Programs; and
(2) Adopt a resolution authorizing the Public Works Director to conduct in-house paving operations on behalf of the City and determining that the actions authorized by this resolution are exempt from CEQA.
Body
DISCUSSION:
Staff will provide an overview of efforts to advance street and sidewalk repairs throughout the City over the past year, including work completed by City crews and through projects delivered as part of the Capital Improvement Program (CIP). The presentation will highlight recently completed projects and summarize areas planned for future improvements. In addition to reporting this progress and the impact of increased funding through Measure G, staff is requesting City Council authorization for in-house City crews to complete paving services in 2027.
Street repair work is consistently identified as a high priority through community survey responses and established City Council budget focus areas. The City continues to make significant investments in repairing and maintaining its street network and delivers this work through two primary approaches:
• Capital Improvement Program (CIP): Projects are designed by the City’s engineering team or with consultants and then advertised for competitive bids to hire contractors to complete construction.
• City Operations Crews: The City’s in-house crews perform street and sidewalk maintenance including paving projects such as grind-and-overlay projects.
Together, these approaches allow the City to address both larger capital improvements and ongoing roadway maintenance needs. In 2026, approximately 55 lane miles of roadway were repaved or resurfaced, improving the City’s average Pavement Condition Index (PCI) rating to 69, up 3 points since 2025. This represents an overall “fair” condition and is above both the statewide and Bay Area averages of 65 and 67 respectively.
Continued investment in street maintenance is important to preserving the City’s roadway network and controlling long-term costs. Streets with PCI ratings in the mid- to low-60’s are at risk of deteriorating more rapidly as cracks and surface voids allow water to penetrate the pavement and weaken the underlying subgrade while vehicle traffic quickly degrades weakened areas. As roads deteriorate, repairs become increasingly expensive. Proactive maintenance helps extend pavement life, improve roadway conditions, and reduce the need for more costly reconstruction.
To continue paving work into next year, Public Works issued a formal invitation for bids in November 2026 for next year’s Citywide paving projects. The notice was posted for at least five consecutive days near the Council Chamber, as required by the City Charter. No bids were received. Accordingly, staff is requesting City Council authorization for in-house City crews to complete the proposed paving work, which includes the following street segments:
• Vallejo Street (Yajome Street to Soscol Avenue)
• Yajome Street (Lincoln Avenue to Pearl Street)
• Coleman Street (Hayes Street to South End)
• Bale Street (Yajome Street to East End)
• Napa Street (Main Street to East End)
• Caymus Street (Brown Street to East End)
• Clinton Street (Browns Street to Soscol Avenue)
• Arroyo Drive (Seminary Street to Browns Street)
• Tulocay Street (Caymus Street to Clinton Street)
• Rose Lane (G Street to South End)
• Action Avenue (North End to Vallejo Street)
• Hayes Street (Jefferson Street to Yount Street)
• Old Sonoma Road (East Side Bridge Deck/Walnut Street to Seymour Street)
• Pine Street (West End to Walnut Street)
• Monroe Street (Oak Street to Laurel Street)
• Seymour Street (Laurel Street to Pine Street)
• Ornduff Street (North End to Pine Street)
• Hartson Street (North End to Old Sonoma Road)
• Madrona Street (Gesford Street to Jefferson Street)
• Capitola Court (West End to Capitola Drive)
• Lexington Court (Shurtleff Avenue to South End)
• Burnell Street (Third Street to Eighth Street)
• Tamarisk Drive (Terrace Drive to Coombsville Road)
• Birkdale Drive (Tamarisk Drive to Wyatt Avenue)
• La Quinta Court (Oakmont Court to South End)
• Oakmont Court (Tamarisk Drive to South End)
• Capitola Drive (Fairview Drive to Capitola Court/End)
• Capitola Drive (Sage Way to Liberty Drive)
• Liberty Drive (Sage Way to Terrace Drive)
• First Street (Soscol Avenue to Silverado Trail)
• Third Street (Soscol Avenue to Lawrence Street)
• Pennyroyal Street (Birkdale Drive to 210’ East of Birkdale Drive)
• Juarez Street (Third Street to South End)
• Shurtleff Avenue (Terrace Drive to Peppergrass Street)
• Bailey Street (Third Street to Fourth Street)
• Fourth Street (Bailey Street to Burnell Street)
• Sixth Street (Soscol Avenue to Burnell Street)
• Seventh Street (Soscol Avenue to Burnell Street)
• Eighth Street (Soscol Avenue to Burnell Street)
• Lawrence Street (Third Street to Fourth Street)
• West Pueblo Avenue (Redwood Road to Rancho Drive)
• West Imola Avenue (Freeway Drive to Highway 29 Off Ramp)
• Pueblo Avenue (Soscol Avenue to California Boulevard)
• Beard Road (Pueblo Avenue to Trancas Street)
• Solano Avenue (Trower Avenue to 250’ North of Trower Avenue)
• Terra Verde Drive (Birkdale Drive to Terrace Street)
Staff recommend that the City Council authorize in-house City crews to complete the Citywide Paving Services projects. Work is expected to begin in early April and continue through October, weather permitting.
FINANCIAL IMPACTS:
There is no additional funding required for the proposed action. Funding for the proposed work is available in the Paving Program’s (30230810) Budget.
CEQA:
City Staff recommends that the City Council determine that the Recommended Action is exempt from CEQA pursuant to CEQA Guidelines Section 15301(c) which exempts the repair or minor alteration of existing streets, sidewalks, gutters, and similar facilities.
DOCUMENTS ATTACHED:
ATCH 1 - Resolution
NOTIFICATION:
None.