Legislation Details

File #: 400-2026   
Type: Consent Calendar Status: Agenda Ready
Meeting Body: CITY COUNCIL OF THE CITY OF NAPA
On agenda: 12/1/2026 Final action:
Title: Paving for Water Facilities and Leak Repairs
Attachments: 1. ATCH 1 - Resolution, 2. EX A - Council Budget Amendment 2P6

To:                     Honorable Mayor and Members of City Council

 

From:                     Joy Eldredge, Utilities Director

 

Prepared By:                     Shannon Lemmon, Senior Civil Engineer

                                          

TITLE:

Title

Paving for Water Facilities and Leak Repairs

 

LABEL

RECOMMENDED ACTION:
Recommendation

 

Adopt a resolution: (1) authorizing the Utilities Director to award and execute a construction contract with QA Constructors, Inc., for the Paving for Water Facilities and Leak Repairs 2026-1 Project (63WD27UTPV) in the bid amount of $621,567; (2) authorizing the Utilities Director to approve change orders and charges for project services up to $228,433 for a total project amount not to exceed $850,000; (3) amending the FY2026/27 Capital Improvement Program as documented in Council Budget Amendment No. 2P6; and (4) determining that the actions authorized by this resolution are exempt from CEQA. 

 

Body

DISCUSSION:

The City of Napa Water Division performs routine and emergency water system repairs and maintenance throughout the year. Following water main repairs, temporary pavement patches are installed to restore vehicular access and maintain roadway safety. For emergency water main breaks, temporary patches also allow disturbed soils to settle and dry before permanent pavement restoration, reducing the potential for future pavement settlement.

 

Permanent pavement restoration typically consists of cutting the pavement one foot along the limits of the trench and replacing the pavement section to its full depth, commonly referred to as T-cut restoration. Where existing pavement conditions warrant, restoration may be expanded to include milling and overlaying the surrounding roadway in accordance with City standards.

 

The Paving for Water Facilities and Leak Repairs 2026-1 Project (Project) includes pavement restoration at more than 90 locations throughout the City. The locations have been prioritized to coordinate with streets scheduled for resurfacing under the City's pavement management program, acknowledging the number of streets has increased significantly due to funding made available through Measure G, while also addressing areas requiring routine maintenance or restoration ahead of scheduled resurfacing.

 

The work generally consists of isolated pavement base repairs (T-cuts) over water facility and water main repair trenches at various locations throughout the City. The Project includes approximately 20,000 square feet of full-depth pavement base repairs of varying depths and approximately 13,000 square feet of two-inch mill and fill adjacent to or surrounding selected base repair areas.

 

The Project also includes allowances for additional pavement repair locations that may be identified and marked in the field during construction. These additional repairs will accommodate water system maintenance and emergency repairs occurring between the time of bidding and completion of the Project. Associated work includes traffic control, pavement marking restoration, and adjustment of utility structures (irons) located within the pavement repair areas.

 

The Project was issued to solicit bids on October 13, 2026. Bids were opened on November 12, 2026. Twelve (12) bids for the Project were received. The engineer’s estimate of probable construction costs for the Project was $730,000.

 

The bids received were as follows:

 

QA Constructors, Inc.                                                                                                          $621,567

Argonaut Constructors, Inc.                                                                                     $622,325

Mission Constructors, Inc.                                                                                                         $627,735

Benchmark Civil Construction                                                                                    $649,862

Cowan and Thompson Construction, Inc.                                           $681,505

Pat Nelson Construction, Inc.                                                                                     $681,950

Martin Brothers Construction                                                                                    $707,000

B&M Civil LLC                                                                                                                              $849,450

Golden State General Engineering, Inc.                                                                $855,599

Ghilotti Bros., Inc.                                                                                                                              $1,103,560

Team Ghilotti, Inc.                                                                                                                              $1,174,141

Mountain Cascade, Inc.                                                                                                         $1,621,500

 

The Napa Municipal Code local businesses preference of three percent (3%) bid reduction factor did not alter the bid results. Based on the lowest responsible bidder submitting a responsive bid, staff recommends awarding the bid to QA Constructors, Inc.

 

The newly created Project 63WD27UTPV requires funding for completion of this work and will be appropriated with funds from the Water Enterprise CIP Fund Balance. The total proposed Project budget is as follows:

 

Project Budget (63WD27UTPV)

QA Constructors, Inc. bid                                                                                                                                                     $621,567

Contingency (20% of bid)                                                                                                                                                    $123,433

Construction Management and Inspection                                                                                               $50,000

Material Testing                                                                                                                                                                           $55,000

Total Project Budget                                                                                                                                                     $850,000


The contingency of 20% is higher than the typical 10% for surface work to provide the ability to address unforeseen subsurface base repairs beyond what is currently visible pavement deterioration, and address additional locations for pipeline repairs and maintenance work of the Water Distribution Crew over the course of this contract.

 

The construction management, inspection and materials testing are estimates. The funds can be used interchangeably among the items listed above.

 

FINANCIAL IMPACTS:

There is no impact to the General Fund.  The proposed FY2026/27 Capital Improvement Program amendment as documented in Council Budget Amendment No. 2P6 will create project 63WD27UTPV and appropriate $850,000 from Water Enterprise CIP account 53160131.  The appropriation will be funded through the remaining project budgets de-obligated and returned to the Water Enterprise CIP Fund Balance via Council Action on November 17, 2026.

 

CEQA:

City staff recommends that the City Council determine that the Recommended Action is exempt from CEQA pursuant to CEQA Guidelines Section 15301(c), which exempts the repair or minor alteration of existing streets, sidewalks, gutters, and similar facilities.

 

DOCUMENTS ATTACHED:

ATCH 1 - Resolution

EX A - Council Budget Amendment 2P6

 

NOTIFICATION:

None